Advisory and deployment partner · mission-critical AI infrastructure · energized

From power-readyto revenue-generating.

Alex AI integrates every layer from site selection to energized racks. Give us land and power; we hand back running AI capacity in 5 to 9 months.

End to end
Site to racks
5 to 9 months
Container to campus
280 MW
Energized compute capacity
Platform capabilities · Site selection to full energization 280MW · 5-9 MO · END↔END

We own the hard part: power, supply chain, and the path to the rack.

280MW energized · one accountable team from site to rack · built by operators, not brokers.

Designed around high-density AI workloads, North American deployment, and site-specific configuration.

  1. STAGE 01

    Site Selection

    We assess power availability, interconnection position, and site constraints before any commitment.

  2. STAGE 02

    Site Development

    Civil works, permitting, and utility coordination advance in parallel with module production.

  3. STAGE 03

    GPU-Ready Modules

    Factory-integrated containerized systems arrive with power, cooling, and controls pre-assembled.

  4. STAGE 04

    Integration and Turnkey

    Modules energize, cooling comes online, controls commission. Site is operational.

ENERGIZED
01

Compute readiness

High-density AI accelerator infrastructure, configured to validated OEM racks.

02

Thermal design

Heat removed at rack density, by workload and climate.

03

Cooling architecture

Direct-to-chip and low-water pathways, selected per site.

04

Power integration

Utility, generation, storage, and renewables into one system.

05

Compliance pathway

AHJ, NRTL, and NEC engineered from design, not after delivery.

06

Factory validation

Integration checked before shipment. Verified again on site.

Energize6to18months sooner.

01
Deploy containers.

Factory-integrated modules arrive first and energize on prepared power.

02
Build in parallel.

Permanent shell and indoor infrastructure progress while capacity is already running.

03
Migrate or expand.

Racks move indoors, remain modular, or extend into a hybrid campus on the same design basis.

Deployment systemsLineup by scenario · Rev 2026.06

Deployment systems.

Modular AI capacity, packaged around the site, power, cooling, and timeline.

ImpactMeasured delivery · Rev 2026.06

Impact, measured in megawatts and months.

0 MW
Energized compute capacity · principal and partner network
0to0
Months · container to campus
0to0
Months sooner than a traditional build
0to0
Months · single container live

Delivered across the principal and partner network · validated project by project.

ContactPrincipal-answered · Rev 2026.06

Start a site readiness review.

For brokers and sourcing agents: a mutual NDA, non-circumvention terms, mandate confirmation, and project qualification precede any pricing work. We protect the people who bring us opportunities and expect the same discipline in return.

Tell us about the site. Location, power status, and target timeline move fastest. Every inquiry is read and answered by a principal, typically within two business days.

Alex AI · intake@alexai.solutions
Answered by a principal within two business days.
Alex AI, LLC · Illinois, USA

Received. A principal will respond within two business days. Qualified opportunities receive our scoping questionnaire and mutual NDA as the next step.